Microsoft just dropped billions on AI in Japan and signed a massive 100-megawatt solar deal to power it. Sounds great, right? But here’s the catch: they built it in a region that throws away solar power, and they skipped the batteries. We dig into the high-stakes gamble at the heart of this deal.
Read the full post: https://doomscrollnews.com/microsoft-japan-solar-ppa-analysis/
/
RSS Feed

Leave a Reply
You must be logged in to post a comment.